The largest crane system constructed to date by J D Neuhaus has been delivered to Westcon Lofteteknikk AS (WCL) of Norway for use on an offshore drilling rig. The semi portal design comprises an A-frame supporting twin overhead horizontal track beams providing a 7.5 metre span.The crane has an approximate height of 11.5 metres with a total weight of 32 tonnes. It is equipped with JDN hydraulic EH 40-H...
For the compressed air distribution plant at the new factory in Swarzedz, Poland, the British tea manufacturer Twinings has selected extruded aluminum modular pipes.
– still an explosive topic
with Smart Wireless technology
in a fruit processing plant
in asbestos decontamination units
in new whisky bottling plant
- extreme requirements
for gas plant
for plastic processing
in FPSO mooring system
and visualisation for a mill
for food producer
Prevention better than protection
test the motors used in the actuators
in one pass
for Brazilian FPSO platform
- increasing energy efficency
improves performance of quarry plant
carbon footprint with LED lighting
Digital Edition Download PDF